Back to Search Start Over

Safety Times for Multistage Assembly System.

Authors :
Lazovic, Goran
Sesum-Cavic, Vesna
Mitrovic, Slobodanka
Radojevic, Slobodan
Dedovic, Nebojsa
Ishtiaq Chaudhary, Naveed
Source :
Mathematical Problems in Engineering. 11/7/2018, p1-10. 10p.
Publication Year :
2018

Abstract

Nowadays, a wide class of problems can be solved by using the classical newsboy model. However, in problems where uncertainty of events and randomness are omnipresent, there is a necessity to adapt the existing solutions and/or find new extensions that will properly answer all requirements. This paper considers a multistage assembly system where interrelated assembly operations with independent stochastic operation times should be planned in an optimal way. Delivery of items in a requested time implies that either delay costs or holding costs appear. The goal is to find optimal safety times. We propose an approximate technique based on successive application of the solution of simpler one-stage problem. The generalized mathematical model suggested is built up on the relaxed hypothesis and can be used in multistage assembly networks. The existence and uniqueness of the solution are proven. The preliminary tests are performed and our approximate technique is compared to exact results. [ABSTRACT FROM AUTHOR]

Details

Language :
English
ISSN :
1024123X
Database :
Academic Search Index
Journal :
Mathematical Problems in Engineering
Publication Type :
Academic Journal
Accession number :
132881523
Full Text :
https://doi.org/10.1155/2018/8208049