Back to Search Start Over

A bi-level fuzzy random model for multi-mode resource-constrained project scheduling problem of photovoltaic power plant.

Authors :
Zhang, Zhe
Liu, Ming
Song, Xiaoling
Source :
Journal of Renewable & Sustainable Energy. May2019, Vol. 11 Issue 3, pN.PAG-N.PAG. 15p. 3 Diagrams, 4 Charts, 4 Graphs.
Publication Year :
2019

Abstract

As the largest energy consumption country, China now pays more and more attention to photovoltaic power generation because solar energy is the largest renewable and sustainable energy reserve in the world. In this case, the photovoltaic power generation plant project plays a crucial role in sustainable development, especially in the underdeveloped northwest region of China. This paper focuses on applying bi-level programing to the multimode resource-constrained project scheduling problem (MRCPSP) in photovoltaic power generation plant construction, which simultaneously considers the practical hierarchical organization structure and an uncertain decision-making environment. A bi-level fuzzy random multiple objective model is developed, wherein the government agency is in the upper decision level, while the contractor is in the lower decision level. Then, motivated by the particular mathematical nature of the proposed bi-level MRCPSP model, a hybrid intelligent algorithm is designed. Finally, a practical case from the Shenneng Futa Kashi-Tashi-Kuergan photovoltaic power generation plant project in a Chinese energy company is applied, and the results validate the practicability of the proposed model and solution algorithm for solving practical photovoltaic power plant project scheduling problems. [ABSTRACT FROM AUTHOR]

Details

Language :
English
ISSN :
19417012
Volume :
11
Issue :
3
Database :
Academic Search Index
Journal :
Journal of Renewable & Sustainable Energy
Publication Type :
Academic Journal
Accession number :
137264019
Full Text :
https://doi.org/10.1063/1.5053623