Cite
SETTING PRIORITY LIST FOR CONSTRUCTION WORKS OF BICYCLE PATH SEGMENTS BASED ON ECKENRODE RATING AND ARAS-F DECISION SUPPORT METHOD INTEGRATED IN GIS.
MLA
Zagorskas, Jurgis, and Zenonas Turskis. “Setting Priority List for Construction Works of Bicycle Path Segments Based on Eckenrode Rating and Aras-F Decision Support Method Integrated in Gis.” Transport (16484142), vol. 35, no. 2, Mar. 2020, pp. 179–92. EBSCOhost, https://doi.org/10.3846/transport.2020.12478.
APA
Zagorskas, J., & Turskis, Z. (2020). Setting Priority List for Construction Works of Bicycle Path Segments Based on Eckenrode Rating and Aras-F Decision Support Method Integrated in Gis. Transport (16484142), 35(2), 179–192. https://doi.org/10.3846/transport.2020.12478
Chicago
Zagorskas, Jurgis, and Zenonas Turskis. 2020. “Setting Priority List for Construction Works of Bicycle Path Segments Based on Eckenrode Rating and Aras-F Decision Support Method Integrated in Gis.” Transport (16484142) 35 (2): 179–92. doi:10.3846/transport.2020.12478.