The low-medium enthalpy geothermal power plant at Lahendong, Indonesia.

Authors :
Agustina, Lina
Suyanto
Indarto
Kamal, Samsul
Saptoadi, Harwin
Sutrisno
Deendarlianto
Widyaparaga, Adhika
Pranoto, Indro
Source :
AIP Conference Proceedings. 2020, Vol. 2248 Issue 1, p1-8. 8p. 3 Diagrams, 3 Charts, 5 Graphs, 1 Map.
Publication Year :
2020

Abstract

The 500kW Lahendong binary cycle geothermal power plant is the first low-medium enthalpy generation system commenced in Indonesia. The pilot plant was established through technology research collaboration among BPPT, GFZ and PT. Geothermal Energy. The proven ORC unit is built by a German industry, where heating and cooling systems are manufactured by national industries. Construction and installation of the pilot plant was completed in 2016. Since September 2017, the pilot plant has continued to operate. The main target of the Indonesian-German cooperation is to disseminate the binary cycle technology throughout Indonesia. This paper discusses operating experience of the plant 500kW during the past six-month period. As a result, to achieve the design conditions (500 kW gross and 424.2 kW net), further work needs to be done. [ABSTRACT FROM AUTHOR]

Details

Language :
English
ISSN :
0094243X
Volume :
2248
Issue :
1
Database :
Academic Search Index
Journal :
AIP Conference Proceedings
Publication Type :
Conference
Accession number :
144652134
Full Text :
https://doi.org/10.1063/5.0018757