Mixed-Integer Programming Model for Transmission Network Expansion Planning with Battery Energy Storage Systems (BESS).

Authors :
Mora, Camilo Andres
Montoya, Oscar Danilo
Trujillo, Edwin Rivas
Source :
Energies (19961073). Sep2020, Vol. 13 Issue 17, p4386. 1p.
Publication Year :
2020

Abstract

This article assesses the costs and benefits of incorporating battery energy storage systems (BESS) in transmission network expansion planning (TEP) over multiple time periods. We propose a mixed-integer programming model (MIP) for joint planning of the installation of battery energy storage systems (BESS) and construction of new transmission lines in multiple periods of time. The mathematical formulation of the presented model is based on the strategies of the agents of a transmission network to maximize their benefit, and on the operational restrictions of the power flows in transmission networks. This analysis is performed for the Garver 6 node test system takes into account the power losses in the lines and the restrictions for the energy stored in BESS. The power flows obtained with the MIP model are compared with AC power flows generated with specialized software for flows in power systems. This allows us to demonstrate the potential of models based on DC power flows to achieve approximate results applicable to the behavior and characteristics of real transmission networks. The results show that the BESS increase the net profit in the transmission networks and reduce their power losses. [ABSTRACT FROM AUTHOR]

Details

Language :
English
ISSN :
19961073
Volume :
13
Issue :
17
Database :
Academic Search Index
Journal :
Energies (19961073)
Publication Type :
Academic Journal
Accession number :
145987890
Full Text :
https://doi.org/10.3390/en13174386