Back to Search Start Over

Improved transformer maintenance plan for reliability centred asset management of power transmission system.

Authors :
Koksal, Aysun
Ozdemir, Aydogan
Source :
IET Generation, Transmission & Distribution (Wiley-Blackwell). May2016, Vol. 10 Issue 8, p1976-1983. 8p.
Publication Year :
2016

Abstract

In a competitive electric market, high maintenance costs brought the necessity of process recruitment to increase the maintenance process efficiency and to extend the asset life time. Reliability centred maintenance has been continually improved together with proper asset management techniques to meet this necessity. This study presents an improved power transformer maintenance plan for reliability centred asset management of Turkish National Power Transmission System. At first, Markov model of existing maintenance procedure is constructed. Model solutions are used to compute the reliability indices and the total costs of the transformer. Then, sensitivity analysis was performed to determine effective transition rates of the model. Finally, optimal maintenance rates and corresponding reliability indices, total cost and life time were determined using actual service data and estimated transition rates. The results are compared with the existing maintenance plan. [ABSTRACT FROM AUTHOR]

Details

Language :
English
ISSN :
17518687
Volume :
10
Issue :
8
Database :
Academic Search Index
Journal :
IET Generation, Transmission & Distribution (Wiley-Blackwell)
Publication Type :
Academic Journal
Accession number :
148082619
Full Text :
https://doi.org/10.1049/iet-gtd.2015.1286