Completion of Central Solenoid for JT-60SA.

Authors :
Murakami, Haruyuki
Tsuchiya, Katsuhiko
Kawano, Katsumi
Kizu, Kaname
Hamada, Kazuya
Itashiki, Yutaro
Okano, Fuminori
Yagyuu, Junnichi
Shibama, Yusuke
Matsunaga, Go
Nomoto, Kazuhiro
Watabe, Yuki
Source :
IEEE Transactions on Applied Superconductivity. Jun2021, Vol. 31 Issue 4, p1-5. 5p.
Publication Year :
2021

Abstract

The construction of a magnet system for the tokamak device of JT-60 super-advanced (JT-60SA) was completed in March 2020. The manufacturing of central solenoid (CS) had been finished in March 2019. The circularity of 4.0 mm is a requirement for CS manufacturing from the point of view of plasma control. The high accurate manufacturing method and jigs had been developed, and the circularity of CS achieves 1.44 mm, which meets the requirement of 4.0 mm. The clearance between the CS and the TF coils is very small, only 14 mm in design. In case the CS touches the TF coils and is subjected to load during operation, the CS can be damaged. Thus the surface dimensions of the CS and the TF coils have been measured before the installation of CS to confirm if the clearance is sufficiently large to avoid the CS crashing into the TF coils. The CS was successfully installed to the tokamak center without any damages in December 2019 as the final step of the magnet assembly of JT-60SA. In this paper, the manufacturing results and the installation of the CS are described. [ABSTRACT FROM AUTHOR]

Details

Language :
English
ISSN :
10518223
Volume :
31
Issue :
4
Database :
Academic Search Index
Journal :
IEEE Transactions on Applied Superconductivity
Publication Type :
Academic Journal
Accession number :
151777815
Full Text :
https://doi.org/10.1109/TASC.2021.3057319