Cite
Evaluating the Marginal Utility of Two-Stage Hydropower Scheduling.
MLA
Ding, Wei, et al. “Evaluating the Marginal Utility of Two-Stage Hydropower Scheduling.” Journal of Water Resources Planning & Management, vol. 148, no. 6, June 2022, pp. 1–15. EBSCOhost, https://doi.org/10.1061/(ASCE)WR.1943-5452.0001556.
APA
Ding, W., Yu, B., Peng, Y., Han, G., & Zhang, L. (2022). Evaluating the Marginal Utility of Two-Stage Hydropower Scheduling. Journal of Water Resources Planning & Management, 148(6), 1–15. https://doi.org/10.1061/(ASCE)WR.1943-5452.0001556
Chicago
Ding, Wei, Bing Yu, Yong Peng, Guang Han, and Lin Zhang. 2022. “Evaluating the Marginal Utility of Two-Stage Hydropower Scheduling.” Journal of Water Resources Planning & Management 148 (6): 1–15. doi:10.1061/(ASCE)WR.1943-5452.0001556.