Assessing the Potential of Implementing a Solar-Based Distributed Energy System for a University Using the Campus Bus Stops.

Authors :
Gálvez, David Morillón
Kerdan, Iván García
Carmona-Paredes, Germán
Source :
Energies (19961073). May2022, Vol. 15 Issue 10, pN.PAG-N.PAG. 16p.
Publication Year :
2022

Abstract

Large educational facilities hold great potential for the implementation of solar-based distributed energy systems. The aim of this paper is to present a prototype and an assessment of a solar-based bus shelter photovoltaic system intended to be implemented at a campus scale that serves as an energy-distributed system. The National Autonomous University of Mexico (UNAM), a campus with an area of 7.3 km2 and bus stops' roof area availability of around 1100 m2 was selected as a case study. The proposed system, apart from considering on-site generation, also considers an increase in end-use services such as the installation of television screens for information, charging docks, surveillance cameras, internet service, and lighting. For the assessment, a load facility survey and an estimation of the baseline energy use was conducted based on two demand use conditions, corresponding to 12 and 24 h for different archetypical stations. It was found that the baseline annual energy consumption for all the bus stops represents from 55–111 MWh. In this paper, an initial prototype of a solar-based bus shelter PV system is presented, and an assessment is carried out to understand its potential application at a large scale. The analysis shows that energy use in the retrofitted stations would rise to 167 MWh/year; however, apart from covering on-site demand, the system has the capacity to generate an additional 175 MWh, feeding nearby university buildings. It is calculated that the system could save around 130 t CO2e annually. The economic analysis shows that the project has a discounted payback (DPB) of almost 9 years and an internal rate of return (IRR) of 5.9%; however, in scenarios where renewable generation and carbon incentives are applied, this improves the project's DPB to 6 years and the IRR to 13%. [ABSTRACT FROM AUTHOR]

Details

Language :
English
ISSN :
19961073
Volume :
15
Issue :
10
Database :
Academic Search Index
Journal :
Energies (19961073)
Publication Type :
Academic Journal
Accession number :
157190893
Full Text :
https://doi.org/10.3390/en15103660