Assessing Project Contingency Reserves with the Expected Cost Overrun Risk Measure.

Authors :
Paquin, Jean-Paul
Morin, Pierre-Paul
Lambert, Annick
Koplyay, Tamas
Source :
Journal of Construction Engineering & Management. Oct2022, Vol. 148 Issue 10, p1-11. 11p.
Publication Year :
2022

Abstract

This paper proposes a coherent risk measure to assess project cost overrun contingency reserves: the project expected cost overrun (ECO). It is shown that the traditional project cost-percentile metric does not qualify as a coherent risk measure and, therefore, that the ECO metric should be adopted. Obtained from the tail expectation of the project cost probability distribution, it measures the average value of project costs exceeding, at any significance level, the project cost baseline. A positive, unique, and exact closed-form solution to the ECO risk measure is devised under, among others, the normal probability distribution. The resulting project cost overrun contingency reserve may be interpreted as an insurance contract covering contingent risk factors and claimable by project managers from their project director once preidentified and agreed-upon contingent high-risk cost impacts are taken into account. The project ECO risk measure is extended to assess the project expected time overrun (ETO) and the project expected time overrun penalty (ETOP) risk measures, quantities that will prove indispensable for successfully tendering under any contractual form the minimum value of project time and project cost bids. They will be covering, at the very least, all relevant potential low-probability high-risk contingent risk factor impacts. [ABSTRACT FROM AUTHOR]

Details

Language :
English
ISSN :
07339364
Volume :
148
Issue :
10
Database :
Academic Search Index
Journal :
Journal of Construction Engineering & Management
Publication Type :
Academic Journal
Accession number :
158542182
Full Text :
https://doi.org/10.1061/(ASCE)CO.1943-7862.0002361