Using Machine Learning to Improve Cost and Duration Prediction Accuracy in Green Building Projects.

Authors :
Darko, Amos
Glushakova, Iuliia
Boateng, Emmanuel B.
Chan, Albert P. C.
Source :
Journal of Construction Engineering & Management. Aug2023, Vol. 149 Issue 8, p1-21. 21p.
Publication Year :
2023

Abstract

A major source of risk in green building projects (GBPs) is inaccurate human prediction of the final project cost and duration, which in turn results in cost and schedule overruns (i.e., poor project performance). This paper presents promising new models to mitigate such risk based upon machine learning (ML). Historical data from 198 GBPs in Hong Kong were used to develop and train two fully connected deep neural networks (DNN) models to learn and predict cost and duration, respectively, based on green building rating (GBR) and other project parameters. The models can predict cost and duration with mean absolute percentage error (MAPE) values of 0.07 and 0.09, respectively. They were then integrated with support vector regression (SVR), and results indicated that the integrated DNN-SVR models improve prediction accuracy, decreasing the MAPE from 0.07 to 0.06 (cost) and 0.09 to 0.07 (duration), respectively. The validated models were for the first time deployed as a ML-based web application for automated, fast, and accurate GBP cost and duration prediction. The feature importance analysis results revealed that the most influential parameters on the GBP cost and duration are project area and weather, respectively, not the GBR. Theoretically, the outcomes of this study provide new insights into the impact of GBR on project cost and duration, which are useful for the promotion of GBPs to improve sustainability. Practically, the study provides policymakers and practitioners with novel ML-based models and a web application to improve GBP delivery performance. Green building projects help to combat climate change and improve our health, wellbeing, and quality of life, but they face two key challenges in their execution: cost overruns and schedule delays. To address these challenges, there is a need for accurate prediction of the final project cost and duration from the early stages of the project. The practical relevance of this study is in the development of the first data-driven and machine learning-based web application for addressing this need. New integrated optimized machine learning models are developed. For practitioners to have access to and use these models without the need to possess machine learning expertise, a corresponding easy-to-use web application is offered. From the design and construction stages of their project, practitioners only need to input the green building ratings in sustainable site, materials and waste, energy use, water use, health and wellbeing, and innovations and additions they want to achieve for the project. The project type and area (type and size), original budget, planned duration, and start month (SM) and year should also be input. Once this project data input is completed, the web application automatically and instantaneously predicts with a high level of accuracy the total costs and time needed to deliver the project successfully—on time and on budget. These cost and duration prediction outputs are a valuable tool in helping practitioners adjust green building project plans and budgets to develop more realistic and accurate project budgets and programs to avoid cost overruns and schedule delays. [ABSTRACT FROM AUTHOR]

Details

Language :
English
ISSN :
07339364
Volume :
149
Issue :
8
Database :
Academic Search Index
Journal :
Journal of Construction Engineering & Management
Publication Type :
Academic Journal
Accession number :
164352009
Full Text :
https://doi.org/10.1061/JCEMD4.COENG-13101