Cite
Maximizing the number of completed tasks in MEC considering time and energy constraints.
MLA
Yu, Haijian, et al. “Maximizing the Number of Completed Tasks in MEC Considering Time and Energy Constraints.” Soft Computing - A Fusion of Foundations, Methodologies & Applications, vol. 27, no. 20, Oct. 2023, pp. 15095–110. EBSCOhost, https://doi.org/10.1007/s00500-023-08695-8.
APA
Yu, H., Liu, J., Deng, C., Chen, C., & Li, K. (2023). Maximizing the number of completed tasks in MEC considering time and energy constraints. Soft Computing - A Fusion of Foundations, Methodologies & Applications, 27(20), 15095–15110. https://doi.org/10.1007/s00500-023-08695-8
Chicago
Yu, Haijian, Jing Liu, Chunhua Deng, Cen Chen, and Keqin Li. 2023. “Maximizing the Number of Completed Tasks in MEC Considering Time and Energy Constraints.” Soft Computing - A Fusion of Foundations, Methodologies & Applications 27 (20): 15095–110. doi:10.1007/s00500-023-08695-8.