Back to Search
Start Over
大型换流站下水滑移码头分载及荷载转移方法研究.
- Source :
-
China Harbour Engineering . 2022, Vol. 42 Issue 8, p12-17. 6p. - Publication Year :
- 2022
-
Abstract
- In order to solve the problem of limited bearing capacity of wharf, a set of methods of load sharing and load transfer between bearing beams of different structural forms in front and back yard of wharf are studied when large-scale products slide onto the ship. The peak value of support reaction force is successfully reduced, so that the wharf with limited bearing capacity can carry nearly 30 000 tons of large-scale products and slide onto the ship without structural reinforcement. [ABSTRACT FROM AUTHOR]
- Subjects :
- *REACTION forces
*FRONT yards & backyards
*PROBLEM solving
*SHIPS
*SHARING
Subjects
Details
- Language :
- Chinese
- ISSN :
- 20957874
- Volume :
- 42
- Issue :
- 8
- Database :
- Academic Search Index
- Journal :
- China Harbour Engineering
- Publication Type :
- Academic Journal
- Accession number :
- 173246548
- Full Text :
- https://doi.org/10.7640/zggwjs202208003