Back to Search Start Over

百米深水库区桥梁浮桥方案研究应用.

Authors :
李送根
马才良
顾绍发
邓文
Source :
China Harbour Engineering. 2022, Vol. 42 Issue 11, p25-29. 5p.
Publication Year :
2022

Abstract

Based on the construction of the Heishui River Bridge during the reconstruction of National Highway G353 in Ningnan County, a supporting project of Baihetan Hydropower Station, the paper presents the research on the bridge construction technology to convert land-based construction to over-water construction of piers for the continuous rigid frame bridge located in a mountainous reservoir. After comparison of pontoon bridges with cable cranes and catwalks, the "pontoon bridge" proposal was selected and accepted, with the pontoon bridge made up of fabricated polythelene pontoons together with a floating platform, a transfer construction elevator and tower cranes. The results show that the "pontoon bridge" proposal had advantages in construction under such special working conditions, and may provide reference for similar projects. [ABSTRACT FROM AUTHOR]

Details

Language :
Chinese
ISSN :
20957874
Volume :
42
Issue :
11
Database :
Academic Search Index
Journal :
China Harbour Engineering
Publication Type :
Academic Journal
Accession number :
173246598
Full Text :
https://doi.org/10.7640/zggwjs202211005