Cite
An integrated chance-constrained stochastic model for a preemptive multi-skilled multi-mode resource-constrained project scheduling problem: A case study of building a sports center.
MLA
Mirnezami, Seyed-Ali, et al. “An Integrated Chance-Constrained Stochastic Model for a Preemptive Multi-Skilled Multi-Mode Resource-Constrained Project Scheduling Problem: A Case Study of Building a Sports Center.” Engineering Applications of Artificial Intelligence, vol. 126, Nov. 2023, p. N.PAG. EBSCOhost, https://doi.org/10.1016/j.engappai.2023.106726.
APA
Mirnezami, S.-A., Tavakkoli-Moghaddam, R., Shahabi-Shahmiri, R., & Ghasemi, M. (2023). An integrated chance-constrained stochastic model for a preemptive multi-skilled multi-mode resource-constrained project scheduling problem: A case study of building a sports center. Engineering Applications of Artificial Intelligence, 126, N.PAG. https://doi.org/10.1016/j.engappai.2023.106726
Chicago
Mirnezami, Seyed-Ali, Reza Tavakkoli-Moghaddam, Reza Shahabi-Shahmiri, and Mohammad Ghasemi. 2023. “An Integrated Chance-Constrained Stochastic Model for a Preemptive Multi-Skilled Multi-Mode Resource-Constrained Project Scheduling Problem: A Case Study of Building a Sports Center.” Engineering Applications of Artificial Intelligence 126 (November): N.PAG. doi:10.1016/j.engappai.2023.106726.