Back to Search Start Over

An Analytical Solution of Frost Heaving Pressure for Cold-region Tunnel Considering Freeze-thaw Cycles and in-situ Stress.

Authors :
Wang-Tao Jiang
Hai-Qiang Jiang
Source :
Jordan Journal of Civil Engineering. 2023, Vol. 17 Issue 4, p668-681. 14p.
Publication Year :
2023

Abstract

The damage caused by the frost heaving pressure on the surrounding rocks and lining structure of cold-region tunnels is always common, which can seriously threaten the safety and stability for cold-region tunnels. Although many achievements of frost heave pressure model have been obtained, two factors have been often ignored, which are in-situ stress and freeze-thaw cycles. Therefore, the calculation mechanical model of cold-region tunnels is established and the expression of frost heaving pressure considering frost heaving effect and in-situ stress is derived based on the elastic theory. The relationship between the elastic modulus of surrounding rocks and the number of freeze-thaw cycles was fitted by experimental data and the calculation formula of frost heaving rate of rocks considering their porosity change caused by freeze-thaw cycles is derived. Based on that, the calculation method of frost heaving pressure considering in-situ stress and freeze-thaw cycles is proposed. The example analysis results show that frost heaving ratio and frost heaving pressure gradually increase with freeze-thaw cycles, which are eventually subjected to a steady value. Simultaneously, the frost heaving pressure acting on lining increases with in-situ stress for tunnels in cold regions and some effective insulation measures should be applied to prevent frost damage. [ABSTRACT FROM AUTHOR]

Details

Language :
English
ISSN :
19930461
Volume :
17
Issue :
4
Database :
Academic Search Index
Journal :
Jordan Journal of Civil Engineering
Publication Type :
Academic Journal
Accession number :
173645985
Full Text :
https://doi.org/10.14525/JJCE.v17i4.09