Back to Search Start Over

Introduction of China's First Live Grid Installed HIS Power Cable System.

Authors :
Ying Xin
Bo Hou
Yanfang Bi
Haixia Xi
Yong Zhang
Anlin Ren
Xicheng Yang
Zhenghe Han
Songtao Wu
Huaikuang Ding
Source :
IEEE Transactions on Applied Superconductivity. Jun2005 Part 2 of 3, Vol. 15 Issue 2, p1814-1817. 4p.
Publication Year :
2005

Abstract

China's first HTS power cable project was started in the second half of 2002 and on site system installation was finished at Puji Substation of China Southern Power Grid in March, 2004. This cable system consists of three 33.5 m, 35 kV/2 kArms cables, six terminations, and a dosed cycle liquid nitrogen cooling station. The conductors of the cables were made of 4 layers of BSCCO 2223 HTS tapes. Off grid field testing and live grid trial operation has been carded out since the completion of the installation. In this paper, we will report the key technical parameters of the system. Descriptions of the installation site, demonstration of the system installation, and results of testing and trial operation will also be presented and discussed. [ABSTRACT FROM AUTHOR]

Details

Language :
English
ISSN :
10518223
Volume :
15
Issue :
2
Database :
Academic Search Index
Journal :
IEEE Transactions on Applied Superconductivity
Publication Type :
Academic Journal
Accession number :
17400091
Full Text :
https://doi.org/10.1109/TASC.2005.849299