Cite
Dominant factors of change control system in the warehouse project based on BIM 5D.
MLA
Indriani, Sarah Salsabila Fitri, and Yusuf Latief. “Dominant Factors of Change Control System in the Warehouse Project Based on BIM 5D.” AIP Conference Proceedings, vol. 2926, no. 1, Jan. 2024, pp. 1–8. EBSCOhost, https://doi.org/10.1063/5.0189322.
APA
Indriani, S. S. F., & Latief, Y. (2024). Dominant factors of change control system in the warehouse project based on BIM 5D. AIP Conference Proceedings, 2926(1), 1–8. https://doi.org/10.1063/5.0189322
Chicago
Indriani, Sarah Salsabila Fitri, and Yusuf Latief. 2024. “Dominant Factors of Change Control System in the Warehouse Project Based on BIM 5D.” AIP Conference Proceedings 2926 (1): 1–8. doi:10.1063/5.0189322.