Back to Search Start Over

A heuristic method for production scheduling of an open pit mining operation.

Authors :
Khan, Asif
Asad, Mohammad Waqar Ali
Topal, Erkan
Source :
International Journal of Mining, Reclamation & Environment. Apr2024, Vol. 38 Issue 4, p293-305. 13p.
Publication Year :
2024

Abstract

A mathematical model for production scheduling of open pit mines maximises the net present value and satisfies the reserves, pit slope angle, and production capacity constraints. A solution to this model aims to deliver an extraction sequence and the movement of materials across various stages within the operation over a defined planning horizon. However, given that the mineral reserves delineated into thousands of mining blocks form the geological input, the model falls in the category of large-scale optimisation problems, i.e. it is computationally intractable, and exact methods cannot solve realistic scenarios of the problem. Therefore, this paper contributes an alternative to the conventional mathematical model along with a corresponding heuristic method to solve this proposed model. An implementation of the proposed method at various realistic instances reveals better performance in terms of net present value, computation time and optimality gap as compared to the traditional methods. [ABSTRACT FROM AUTHOR]

Details

Language :
English
ISSN :
17480930
Volume :
38
Issue :
4
Database :
Academic Search Index
Journal :
International Journal of Mining, Reclamation & Environment
Publication Type :
Academic Journal
Accession number :
175980320
Full Text :
https://doi.org/10.1080/17480930.2023.2281201