Cite
Accessibility Evaluation of a Newly Planned High-Speed Railway Station in a Metropolitan Core Area Based on a Modified Two-Step Floating Catchment Area Method.
MLA
Gao, Yueer, et al. “Accessibility Evaluation of a Newly Planned High-Speed Railway Station in a Metropolitan Core Area Based on a Modified Two-Step Floating Catchment Area Method.” Journal of Urban Planning & Development, vol. 150, no. 2, June 2024, pp. 1–15. EBSCOhost, https://doi.org/10.1061/JUPDDM.UPENG-4306.
APA
Gao, Y., Kan, X., Cheng, J., Zheng, S., & Chen, M. (2024). Accessibility Evaluation of a Newly Planned High-Speed Railway Station in a Metropolitan Core Area Based on a Modified Two-Step Floating Catchment Area Method. Journal of Urban Planning & Development, 150(2), 1–15. https://doi.org/10.1061/JUPDDM.UPENG-4306
Chicago
Gao, Yueer, Xiaoxi Kan, Jing Cheng, Si Zheng, and Meiwen Chen. 2024. “Accessibility Evaluation of a Newly Planned High-Speed Railway Station in a Metropolitan Core Area Based on a Modified Two-Step Floating Catchment Area Method.” Journal of Urban Planning & Development 150 (2): 1–15. doi:10.1061/JUPDDM.UPENG-4306.