Quantitative Risk Analysis for Construction Projects Considering Risks Correlations and Fuzzy Logic.

Authors :
Julio Cuadros-López, Álvaro
Cruces Arévalo, Nicolle Alexandra
Ortiz, Claudia
Source :
UIS Ingenierías. ene-mar2024, Vol. 23 Issue 1, p127-140. 13p.
Publication Year :
2024

Abstract

Construction projects have a high level of uncertainty because of several risk factors. Risks may affect projects in many ways resulting in time delays or cost overruns. Thus, the evaluation of uncertainty is required to get a reliable schedule. This research proposes a method for project scheduling considering risks. Expert judgment is used to identify and analyze risks. Potential risks are identified through Failure Mode Effect Analysis (FMEA). Risks impact is evaluated through fuzzy logic and Monte Carlo Simulation (MCS). The simulation considered the relationship between risks, and risks and activities. [ABSTRACT FROM AUTHOR]

Details

Language :
English
ISSN :
16574583
Volume :
23
Issue :
1
Database :
Academic Search Index
Journal :
UIS Ingenierías
Publication Type :
Academic Journal
Accession number :
177139487
Full Text :
https://doi.org/10.18273/revuin.v23n1-2024011