Back to Search Start Over

Research on hybrid reservoir scheduling optimization based on improved walrus optimization algorithm with coupling adaptive ε constraint and multi-strategy optimization.

Authors :
He, Ji
Tang, Yefeng
Guo, Xiaoqi
Chen, Haitao
Guo, Wen
Source :
Scientific Reports. 5/25/2024, p1-13. 13p.
Publication Year :
2024

Abstract

Reservoir flood control scheduling is a challenging optimization task, particularly due to the complexity of various constraints. This paper proposes an innovative algorithm design approach to address this challenge. Combining the basic walrus optimization algorithm with the adaptive ε-constraint method and introducing the SPM chaotic mapping for population initialization, spiral search strategy, and local enhancement search strategy based on Cauchy mutation and reverse learning significantly enhances the algorithm's optimization performance. On this basis, innovate an adaptive approach ε A New Algorithm for Constraints and Multi Strategy Optimization Improvement (ε-IWOA). To validate the performance of the ε-IWOA algorithm, 24 constrained optimization test functions are used to test its optimization capabilities and effectiveness in solving constrained optimization problems. Experimental results demonstrate that the ε-IWOA algorithm exhibits excellent optimization ability and stable performance. Taking the Taolinkou Reservoir, Daheiting Reservoir, and Panjiakou Reservoir in the middle and lower reaches of the Luanhe River Basin as a case study, this paper applies the ε-IWOA algorithm to practical reservoir scheduling problems by constructing a three-reservoir flood control scheduling system with Luanxian as the control point. A comparative analysis is conducted with the ε-WOA, ε-DE and ε-PSO (particle swarm optimization) algorithms.The experimental results indicate that ε-IWOA algorithm performs the best in optimization, with the occupied flood control capacity of the three reservoirs reaching 89.32%, 90.02%, and 80.95%, respectively. The control points in Luan County can reduce the peak by 49%.This provides a practical and effective solution method for reservoir optimization scheduling models. This study offers new ideas and solutions for flood control optimization scheduling of reservoir groups, contributing to the optimization and development of reservoir scheduling work. [ABSTRACT FROM AUTHOR]

Details

Language :
English
ISSN :
20452322
Database :
Academic Search Index
Journal :
Scientific Reports
Publication Type :
Academic Journal
Accession number :
177463992
Full Text :
https://doi.org/10.1038/s41598-024-62722-8