Back to Search Start Over

Technical assessment of the state of the power autotransformer at the Fayzabod substation in normal and in emergency mode.

Authors :
Abdullabekova, Dilafruz
Source :
AIP Conference Proceedings. 2024, Vol. 3152 Issue 1, p1-5. 5p.
Publication Year :
2024

Abstract

Due to the growth in electricity consumption, the load on power auto-transformers is growing, this leads to their breakdown, and at the moment, the replacement of existing power auto-transformers is becoming the most acute problem. Of the main reasons for the breakdown of power autotransformers is their deterioration. According to studies, today in Uzbekistan 50-60% of power autotransfonners operate with an expired service life, therefore, this article considers a technical assessment of the state of the power autotransformer at the Fayzabod substation in normal and emergency mode. [ABSTRACT FROM AUTHOR]

Details

Language :
English
ISSN :
0094243X
Volume :
3152
Issue :
1
Database :
Academic Search Index
Journal :
AIP Conference Proceedings
Publication Type :
Conference
Accession number :
177942576
Full Text :
https://doi.org/10.1063/5.0221796