Back to Search
Start Over
The design intent document can live on after construction is completed.
- Source :
-
Engineered Systems . Aug2000, Vol. 17 Issue 8, p36. 1p. 1 Color Photograph. - Publication Year :
- 2000
-
Abstract
- Discusses the value of the design intent document (DID) as an operations and maintenance reference throughout the life of a building's heating, ventilation, air-conditioning, and refrigeration systems. DID overview; Interpretation of the DID; Use of the DID in future renovation design; Maintenance and updating of the DID.
- Subjects :
- *VENTILATION
*BUILDING maintenance
Subjects
Details
- Language :
- English
- ISSN :
- 08919976
- Volume :
- 17
- Issue :
- 8
- Database :
- Academic Search Index
- Journal :
- Engineered Systems
- Publication Type :
- Periodical
- Accession number :
- 3451916