Back to Search Start Over

The design intent document can live on after construction is completed.

Authors :
Ellis, Rebecca Thatcher
Source :
Engineered Systems. Aug2000, Vol. 17 Issue 8, p36. 1p. 1 Color Photograph.
Publication Year :
2000

Abstract

Discusses the value of the design intent document (DID) as an operations and maintenance reference throughout the life of a building's heating, ventilation, air-conditioning, and refrigeration systems. DID overview; Interpretation of the DID; Use of the DID in future renovation design; Maintenance and updating of the DID.

Subjects

Subjects :
*VENTILATION
*BUILDING maintenance

Details

Language :
English
ISSN :
08919976
Volume :
17
Issue :
8
Database :
Academic Search Index
Journal :
Engineered Systems
Publication Type :
Periodical
Accession number :
3451916