Back to Search
Start Over
Beam commissioning for neutron and muon facility at J-PARC
- Source :
-
Nuclear Instruments & Methods in Physics Research Section A . Feb2009, Vol. 600 Issue 1, p41-43. 3p. - Publication Year :
- 2009
-
Abstract
- Abstract: At J-PARC, an intensive pulsed 3-GeV proton beam (1MW and 25Hz) extracted from a rapid cycling synchrotron (RCS) is introduced to a mercury target for a neutron source and to a carbon graphite target for a muon source. In order to obtain the beam characteristics before irradiating the targets, beam commissioning was carried out using a beam dump during the accelerator study. Along the beam line to the dump, several beam monitors were located for beam diagnostics. It was found that all the beam monitors functioned as expected. [Copyright &y& Elsevier]
Details
- Language :
- English
- ISSN :
- 01689002
- Volume :
- 600
- Issue :
- 1
- Database :
- Academic Search Index
- Journal :
- Nuclear Instruments & Methods in Physics Research Section A
- Publication Type :
- Academic Journal
- Accession number :
- 36474855
- Full Text :
- https://doi.org/10.1016/j.nima.2008.11.068