Cite
Estimation of magnitude and time duration of temporary overvoltages using ANN in transmission lines during power system restoration
MLA
Taher, Seyed Abbas, and Iman Sadeghkhani. “Estimation of Magnitude and Time Duration of Temporary Overvoltages Using ANN in Transmission Lines during Power System Restoration.” Simulation Modelling Practice & Theory, vol. 18, no. 6, June 2010, pp. 787–805. EBSCOhost, https://doi.org/10.1016/j.simpat.2010.01.016.
APA
Taher, S. A., & Sadeghkhani, I. (2010). Estimation of magnitude and time duration of temporary overvoltages using ANN in transmission lines during power system restoration. Simulation Modelling Practice & Theory, 18(6), 787–805. https://doi.org/10.1016/j.simpat.2010.01.016
Chicago
Taher, Seyed Abbas, and Iman Sadeghkhani. 2010. “Estimation of Magnitude and Time Duration of Temporary Overvoltages Using ANN in Transmission Lines during Power System Restoration.” Simulation Modelling Practice & Theory 18 (6): 787–805. doi:10.1016/j.simpat.2010.01.016.