Back to Search
Start Over
Performance evaluation and prediction for a pilot two-stage on-site constructed wetland system employing dewatered alum sludge as main substrate
- Source :
-
Bioresource Technology . May2011, Vol. 102 Issue 10, p5645-5652. 8p. - Publication Year :
- 2011
-
Abstract
- Abstract: Dewatered alum sludge, a widely generated by-product of drinking water treatment plants using aluminium salts as coagulants was used as main substrate in a pilot on-site constructed wetland system treating agricultural wastewater for 11months. Treatment performance was evaluated and spreadsheet analysis was used to establish correlations between water quality variables. Results showed that removal rates (in g/m2 d) of 4.6–249.2 for 5day biochemical oxygen demand (BOD5), 35.6–502.0 for chemical oxygen demand (COD), 2.5–14.3 for total phosphorus (TP) and 2.7–14.6 for phosphate (PO4 chieved. Multiple regression analysis showed that effluent BOD5 and COD can be predicted to a reasonable accuracy (R 2 =0.665 and 0.588, respectively) by using input variables which can be easily monitored in real time as sole predictor variables. This could provide a rapid and cheap alternative to such laborious and time consuming analyses and also serve as management tools for day-to-day process control. [Copyright &y& Elsevier]
Details
- Language :
- English
- ISSN :
- 09608524
- Volume :
- 102
- Issue :
- 10
- Database :
- Academic Search Index
- Journal :
- Bioresource Technology
- Publication Type :
- Academic Journal
- Accession number :
- 60238142
- Full Text :
- https://doi.org/10.1016/j.biortech.2011.02.065