Back to Search Start Over

DEVELOPMENT OF SLOWED DOWN BEAMS AT THE FRAGMENT SEPARATOR FOR FAIR.

Authors :
Naqvi, F.
Boutachkov, P.
Górska, M.
Gerl, J.
Farinon, F.
Gregor, E. T.
Hadynska, K.
Jhingan, A.
Janik, R.
Kojouharov, I.
Kondratyev, N. A.
Alvarez, M. A. G.
Mukha, I.
Napiorkowski, P.
Nociforo, C.
Pietak, D.
Prokopowicz, W.
Pietri, S.
Prochazka, A.
Schaffner, H.
Source :
Acta Physica Polonica B. Mar/Apr2011, Vol. 42 Issue 3/4, p725-728. 4p.
Publication Year :
2011

Abstract

The feasibility studies of the slowed down beam setup involving deceleration of a 64Ni beam at 250 MeV/u to 13 MeV/u in a thick Al degrader was performed at the FRagment Separator (FRS) at GSI. The experimentally measured energy spread and the nuclear reaction yields in the degrader are in good agreement with simulations. [ABSTRACT FROM AUTHOR]

Details

Language :
English
ISSN :
05874254
Volume :
42
Issue :
3/4
Database :
Academic Search Index
Journal :
Acta Physica Polonica B
Publication Type :
Academic Journal
Accession number :
71525341
Full Text :
https://doi.org/10.5506/APhysPolB.42.725