Back to Search
Start Over
DEVELOPMENT OF SLOWED DOWN BEAMS AT THE FRAGMENT SEPARATOR FOR FAIR.
- Source :
-
Acta Physica Polonica B . Mar/Apr2011, Vol. 42 Issue 3/4, p725-728. 4p. - Publication Year :
- 2011
-
Abstract
- The feasibility studies of the slowed down beam setup involving deceleration of a 64Ni beam at 250 MeV/u to 13 MeV/u in a thick Al degrader was performed at the FRagment Separator (FRS) at GSI. The experimentally measured energy spread and the nuclear reaction yields in the degrader are in good agreement with simulations. [ABSTRACT FROM AUTHOR]
Details
- Language :
- English
- ISSN :
- 05874254
- Volume :
- 42
- Issue :
- 3/4
- Database :
- Academic Search Index
- Journal :
- Acta Physica Polonica B
- Publication Type :
- Academic Journal
- Accession number :
- 71525341
- Full Text :
- https://doi.org/10.5506/APhysPolB.42.725