Back to Search Start Over

REINTRODUCING IN THE ECONOMIC CIRCUIT OF WASTE DUMPS FROM OLTENIA. CASE STUDY NEGOMIR VALLEY WASTE DUMP.

Authors :
Alin, Smeu Cosmin
Dumitru, Iacob
Viorel, Voin
Source :
Annals of the University of Petrosani Mining Engineering. 2011, Vol. 12, p228-236. 9p. 1 Black and White Photograph, 3 Diagrams, 2 Charts, 3 Graphs.
Publication Year :
2011

Abstract

Given that the tasks ahead for reuse degraded terrains by mining activities are very large and growing, especially in the mining basins of Oltenia, where open pit mining prevailed and which continues today, there must not be spared any effort to achieve highquality work and achieve in this way, the maximum economic effect for reusing degraded lands in each variant. This paper presents an example of planning works necessary to be carried out in this purpose, possible to be implemented for waste deposits from Oltenia, namely Negomir Valley dump. [ABSTRACT FROM AUTHOR]

Details

Language :
English
ISSN :
14549174
Volume :
12
Database :
Academic Search Index
Journal :
Annals of the University of Petrosani Mining Engineering
Publication Type :
Academic Journal
Accession number :
71739886