Back to Search Start Over

Prioritizing Circuit Breaker and Protective Relay Maintenance Using an Arc Flash Hazard Assessment.

Authors :
Doan, Daniel R.
Source :
IEEE Transactions on Industry Applications. Mar2013, Vol. 49 Issue 2, p799-802. 4p.
Publication Year :
2013

Abstract

In difficult economic times, companies sometimes delay the performance of maintenance on electrical power distribution equipment to save costs. If this happens, some circuit breakers (CBs) or protective relays will miss their scheduled maintenance and testing. This can create a significant safety risk if those protective devices are used to manage arc flash hazards. This paper describes a study method to determine which CBs and protective relays in a system are the most critical so that they can be prioritized for continued proper maintenance. [ABSTRACT FROM AUTHOR]

Details

Language :
English
ISSN :
00939994
Volume :
49
Issue :
2
Database :
Academic Search Index
Journal :
IEEE Transactions on Industry Applications
Publication Type :
Academic Journal
Accession number :
86153333
Full Text :
https://doi.org/10.1109/TIA.2013.2242818