Back to Search Start Over

Programación Multiobjetivo en un Sistema de Fabricación Tipo "Contra Existencia" (Job Shop).

Authors :
Coca, Germán A.
Castrillón, Omar D.
Ruiz, Santiago
Source :
Información Tecnológica. 2013, Vol. 24 Issue 6, p79-92. 14p.
Publication Year :
2013

Abstract

In this paper, the performance of the variables: makespan time, defective fraction due to operator fatigue and direct labor cost, in a job shop manufacturing system is presented. Two methods are compared; the first one blends elements from VEGA and MOGA algorithms (V&M), while the second one corresponds to a weighted sums method (WSM). Applying these methodologies, it was found that the method V&M has a better performance than the WSM. Comparing he variable makespan time (in hours) the first is better by 7.0 %; comparing the variable makespan time (in weeks) by 6.7 %; and comparing the variable defective fraction by 1.4 %. Regarding the variable labor costs, both methods have the same performance. [ABSTRACT FROM AUTHOR]

Details

Language :
Spanish
ISSN :
07168756
Volume :
24
Issue :
6
Database :
Academic Search Index
Journal :
Información Tecnológica
Publication Type :
Academic Journal
Accession number :
93326304
Full Text :
https://doi.org/10.4067/S0718-07642013000600011