Back to Search
Start Over
Efficient nitrogen removal from municipal wastewater using an integrated fixed-film activated sludge process in a novel air-lifting loop reactor: A pilot-scale demonstration.
- Source :
-
Journal of environmental management [J Environ Manage] 2024 Jun; Vol. 360, pp. 121108. Date of Electronic Publication: 2024 May 15. - Publication Year :
- 2024
-
Abstract
- A novel air-lifting loop reactor combines anoxic, oxic, and settling zones to achieve organic and nutrient removal, as well as solid-liquid separation. To address sludge settling ability and operation stability issues caused by low dissolved oxygen in aerobic zones, this study proposes using modified polypropylene carriers to establish a fixed-film activated sludge (IFAS) system. A pilot-scale demonstration of the IFAS-based air-lifting loop reactor is conducted, and the results show successful operation for approximately 300 days. The pilot-scale reactor achieves a maximum aerobic granulation ratio of 16% in the bulk liquid. The IFAS system contributes to efficient removal of organic matter (96%) and nitrogen (94%) by facilitating simultaneous nitrification and denitrification, as well as fast solid-liquid separation with a low sludge volume index of 34 mL/g. Microbial analysis reveals enrichment of functional bacteria involved in nitrification, denitrification, and flocculation throughout the operation process.<br />Competing Interests: Declaration of competing interest The authors have no relevant financial or non-financial interests to disclose.<br /> (Copyright © 2024 Elsevier Ltd. All rights reserved.)
Details
- Language :
- English
- ISSN :
- 1095-8630
- Volume :
- 360
- Database :
- MEDLINE
- Journal :
- Journal of environmental management
- Publication Type :
- Academic Journal
- Accession number :
- 38754189
- Full Text :
- https://doi.org/10.1016/j.jenvman.2024.121108