Back to Search
Start Over
Management of dental implant components following abutment screw loosening: A case report.
- Source :
-
The Journal of oral implantology [J Oral Implantol] 2025 Feb 05. Date of Electronic Publication: 2025 Feb 05. - Publication Year :
- 2025
- Publisher :
- Ahead of Print
-
Abstract
- Management of implant abutment screw loosening should go beyond simply retightening the abutment screw. This case report highlights the need to check all components for damage before disinfection and re-tightening if possible. Major concerns include the implant-abutment connection site, screw, and debridement of the internal implant surfaces. Scanning electron microscopy and optical microscopic exam of the debris removed after cleaning demonstrated the presence of titanium metal particles and biological material. Protocols should be developed to address these issues before reattaching the implant restoration.<br />Competing Interests: This work has been presented in part at the Pacific Coast Society of prosthodontists 2024 Chandur Wadhwani has a conflict of interest in Implantwise as a director and consultant.
Details
- Language :
- English
- ISSN :
- 1548-1336
- Database :
- MEDLINE
- Journal :
- The Journal of oral implantology
- Publication Type :
- Academic Journal
- Accession number :
- 39906936
- Full Text :
- https://doi.org/10.1563/aaid-joi-D-24-00182