Back to Search Start Over

Stochastic Unit Commitment With Topology Control Recourse for Power Systems With Large-Scale Renewable Integration.

Authors :
Shi, Jiaying
Oren, Shmuel S.
Source :
IEEE Transactions on Power Systems; May2018, Vol. 33 Issue 3, p3315-3324, 10p
Publication Year :
2018

Abstract

In this paper, we model topology control through transmission switching as a recourse action in the day-ahead operation of power systems with large-scale renewable generation resources. We prove that transmission switching could only reduce the linear objective value of direct current optimal power flow when congestion exists. However, we also show, through a simple example, that unit commitment cost could be reduced by transmission switching even in the absence of congestion. To solve the stochastic unit commitment with topology control within reasonable computational time, we proposed a heuristic that first decomposes a practical system into zones and then solves the problem for each zone in parallel. The benefit of topology control recourse is demonstrated on a network representing the Central European System. We compare the costs of the network with different loading and renewable generation conditions. The cost reduction of the test system can reach 3.34% with heavy load and large-scale renewable generation while in a single zone the cost reduction can be above 7%. [ABSTRACT FROM PUBLISHER]

Details

Language :
English
ISSN :
08858950
Volume :
33
Issue :
3
Database :
Complementary Index
Journal :
IEEE Transactions on Power Systems
Publication Type :
Academic Journal
Accession number :
129266045
Full Text :
https://doi.org/10.1109/TPWRS.2017.2772168