Cite
Research on the Setting of Prequalification Indicators of General Contracting Project Based on Initial Trust.
MLA
YUAN Liang-liang, et al. “Research on the Setting of Prequalification Indicators of General Contracting Project Based on Initial Trust. (English).” Journal of Engineering Management / Gongcheng Guanli Xuebao, vol. 33, no. 5, Oct. 2019, pp. 97–102. EBSCOhost, https://doi.org/10.13991/j.cnki.jem.2019.05.018.
APA
YUAN Liang-liang, Zou Jin-feng, YIN Yi-lin, GAO Ming-na, & WEN Ning-yong. (2019). Research on the Setting of Prequalification Indicators of General Contracting Project Based on Initial Trust. (English). Journal of Engineering Management / Gongcheng Guanli Xuebao, 33(5), 97–102. https://doi.org/10.13991/j.cnki.jem.2019.05.018
Chicago
YUAN Liang-liang, Zou Jin-feng, YIN Yi-lin, GAO Ming-na, and WEN Ning-yong. 2019. “Research on the Setting of Prequalification Indicators of General Contracting Project Based on Initial Trust. (English).” Journal of Engineering Management / Gongcheng Guanli Xuebao 33 (5): 97–102. doi:10.13991/j.cnki.jem.2019.05.018.