Back to Search
Start Over
Prediction Interval Adjustment for Load-Forecasting using Machine Learning.
Prediction Interval Adjustment for Load-Forecasting using Machine Learning.
- Source :
- Applied Sciences (2076-3417); Dec2019, Vol. 9 Issue 24, p5269, 20p
- Publication Year :
- 2019
-
Abstract
- Featured Application: Prediction interval adjustment designed to be used in the Real-Time Electricity Market in Mexico. Electricity load-forecasting is an essential tool for effective power grid operation and energy markets. However, the lack of accuracy on the estimation of the electricity demand may cause an excessive or insufficient supply which can produce instabilities in the power grid or cause load cuts. Hence, probabilistic load-forecasting methods have become more relevant since these allow an understanding of not only load-point forecasts but also the uncertainty associated with it. In this paper, we develop a probabilistic load-forecasting method based on Association Rules and Artificial Neural Networks for Short-Term Load Forecasting (2 h ahead). First, neural networks are used to estimate point-load forecasts and the variance between these and observations. Then, using the latter, a simple prediction interval is calculated. Next, association rules are employed to adjust the prediction intervals by exploiting the confidence and support of the association rules. The main idea is to increase certainty regarding predictions, thus reducing prediction interval width in accordance to the rules found. Results show that the presented methodology provides a closer prediction interval without sacrificing accuracy. Prediction interval quality and effectiveness is measured using Prediction Interval Coverage Probability (PICP) and the Dawid–Sebastiani Score (DSS). PICP and DSS per horizon shows that the Adjusted and Normal prediction intervals are similar. Also, probabilistic and point-forecast Means Absolute Error (MAE) and Root Mean Squared Error (RMSE) metrics are used. Probabilistic MAE indicates that Adjusted prediction intervals fail by less than 2.5 MW along the horizons, which is not significant if we compare it to the 1.3 MW of the Normal prediction interval failure. Also, probabilistic RMSE shows that the probabilistic error tends to be larger than MAE along the horizons, but the maximum difference between Adjusted and Normal probabilistic RMSE is less than 6 MW, which is also not significant. [ABSTRACT FROM AUTHOR]
Details
- Language :
- English
- ISSN :
- 20763417
- Volume :
- 9
- Issue :
- 24
- Database :
- Complementary Index
- Journal :
- Applied Sciences (2076-3417)
- Publication Type :
- Academic Journal
- Accession number :
- 140943381
- Full Text :
- https://doi.org/10.3390/app9245269