Back to Search Start Over

Flexible Job Shop Scheduling Problem with Sequence Dependent Setup Time and Job Splitting: Hospital Catering Case Study.

Authors :
Abderrabi, Fatima
Godichaud, Matthieu
Yalaoui, Alice
Yalaoui, Farouk
Amodeo, Lionel
Qerimi, Ardian
Thivet, Eric
Source :
Applied Sciences (2076-3417); Feb2021, Vol. 11 Issue 4, p1504, 27p
Publication Year :
2021

Abstract

This paper aims to study a real case of an optimization problem derived from a hospital supply chain. The present work focuses on developing operational decision support models and algorithms for production process scheduling in hospital catering. The addressed production system is considered as a flexible job shop system. The objective is to minimize the total flow time. A novel mathematical model and two metaheuristics for the production scheduling of multi-product and multi-stage food processes are developed. These methods have proven their effectiveness for the scheduling of operations of the food production processes and allowed significant improvements in the performance of the studied production system. [ABSTRACT FROM AUTHOR]

Details

Language :
English
ISSN :
20763417
Volume :
11
Issue :
4
Database :
Complementary Index
Journal :
Applied Sciences (2076-3417)
Publication Type :
Academic Journal
Accession number :
149019309
Full Text :
https://doi.org/10.3390/app11041504