Cite
Microseismicity-based method for the dynamic estimation of the potential rockburst scale during tunnel excavation.
MLA
Liu, Guo-Feng, et al. “Microseismicity-Based Method for the Dynamic Estimation of the Potential Rockburst Scale during Tunnel Excavation.” Bulletin of Engineering Geology & the Environment, vol. 80, no. 5, May 2021, pp. 3605–28. EBSCOhost, https://doi.org/10.1007/s10064-021-02173-x.
APA
Liu, G.-F., Jiang, Q., Feng, G.-L., Chen, D.-F., Chen, B.-R., & Zhao, Z.-N. (2021). Microseismicity-based method for the dynamic estimation of the potential rockburst scale during tunnel excavation. Bulletin of Engineering Geology & the Environment, 80(5), 3605–3628. https://doi.org/10.1007/s10064-021-02173-x
Chicago
Liu, Guo-Feng, Quan Jiang, Guang-Liang Feng, Dong-Fang Chen, Bing-Rui Chen, and Zhou-Neng Zhao. 2021. “Microseismicity-Based Method for the Dynamic Estimation of the Potential Rockburst Scale during Tunnel Excavation.” Bulletin of Engineering Geology & the Environment 80 (5): 3605–28. doi:10.1007/s10064-021-02173-x.