Back to Search
Start Over
考虑盾壳与土体摩擦力的盾构下穿既有地铁隧道施工控制研究.
- Source :
- Tunnel Construction / Suidao Jianshe (Zhong-Yingwen Ban); May2021, Vol. 41 Issue 5, p729-739, 11p
- Publication Year :
- 2021
-
Abstract
- <i>Copyright of Tunnel Construction / Suidao Jianshe (Zhong-Yingwen Ban) is the property of Tunnel Construction Editorial Office and its content may not be copied or emailed to multiple sites or posted to a listserv without the copyright holder's express written permission. However, users may print, download, or email articles for individual use. This abstract may be abridged. No warranty is given about the accuracy of the copy. Users should refer to the original published version of the material for the full abstract.</i> (Copyright applies to all Abstracts.)
Details
- Language :
- Chinese
- ISSN :
- 20964498
- Volume :
- 41
- Issue :
- 5
- Database :
- Complementary Index
- Journal :
- Tunnel Construction / Suidao Jianshe (Zhong-Yingwen Ban)
- Publication Type :
- Academic Journal
- Accession number :
- 150860050
- Full Text :
- https://doi.org/10.3973/j.issn.2096-4498.2021.05.005