Cite
A rule-based heuristic finite capacity scheduling system for semiconductor backend assembly.
MLA
Yin Xiao-Feng, et al. “A Rule-Based Heuristic Finite Capacity Scheduling System for Semiconductor Backend Assembly.” International Journal of Computer Integrated Manufacturing, vol. 17, no. 8, Dec. 2004, pp. 733–49. EBSCOhost, https://doi.org/10.1080/0951192042000237537.
APA
Yin Xiao-Feng, Chua Tay-Jin, Wang Feng-Yu, Liu Ming-Wei, Cai Tian-Xiang, Yan Wen-Jing, Chong Chin-Soon, Ju-Ping, Z., & Mei-Yoke, L. (2004). A rule-based heuristic finite capacity scheduling system for semiconductor backend assembly. International Journal of Computer Integrated Manufacturing, 17(8), 733–749. https://doi.org/10.1080/0951192042000237537
Chicago
Yin Xiao-Feng, Chua Tay-Jin, Wang Feng-Yu, Liu Ming-Wei, Cai Tian-Xiang, Yan Wen-Jing, Chong Chin-Soon, Zhu Ju-Ping, and Lam Mei-Yoke. 2004. “A Rule-Based Heuristic Finite Capacity Scheduling System for Semiconductor Backend Assembly.” International Journal of Computer Integrated Manufacturing 17 (8): 733–49. doi:10.1080/0951192042000237537.