Cite
A bi-objective production planning for a flexible supply chain solved using NSGA-II and MOPSO.
MLA
Karimi, S. K., et al. “A Bi-Objective Production Planning for a Flexible Supply Chain Solved Using NSGA-II and MOPSO.” International Journal of Industrial Engineering & Management (IJIEM), vol. 13, no. 1, Mar. 2022, pp. 18–37. EBSCOhost, https://doi.org/10.24867/IJIEM-2022-1-298.
APA
Karimi, S. K., Sadjadi, S. J., & Naini, S. G. J. (2022). A bi-objective production planning for a flexible supply chain solved using NSGA-II and MOPSO. International Journal of Industrial Engineering & Management (IJIEM), 13(1), 18–37. https://doi.org/10.24867/IJIEM-2022-1-298
Chicago
Karimi, S. K., S. J. Sadjadi, and S. G. J. Naini. 2022. “A Bi-Objective Production Planning for a Flexible Supply Chain Solved Using NSGA-II and MOPSO.” International Journal of Industrial Engineering & Management (IJIEM) 13 (1): 18–37. doi:10.24867/IJIEM-2022-1-298.