Back to Search Start Over

AHP Method for Supply Chain Management Performance Measurement in Construction (Study Case: Bridge Project).

Authors :
Mustikasari, Anita
Handayani, Naniek Utami
Wibowo, Mochammad Agung
Simanungkalit, Chemink Sugondo
Source :
Proceedings of the International Conference on Industrial Engineering & Operations Management; 11/3/2021, p219-225, 7p
Publication Year :
2021

Abstract

The objective of this study is using the Analytical Hierarchy Process (AHP) method to determine the value of supply chain performance in the Sikatak bridge construction project and provide recommendations for improvements to the Sikatak Bridge construction project. The AHP provided are accurate performance assessment on the Sikatak Bridge construction project is expected to facilitate the existing SCM process. Therefore, the effectiveness of the supply chain on the project is increasing. The results of this study are based on monitoring system of supply chain performance, this value belongs to the average index or average. There are two indicators that need to be improved from the four indicators used, namely ROF and TSCM. The strategy that can be done to increase the value of ROF and TSCM is to ensure that the process plan or project development planning is carried out optimally so as to produce optimum costs, which will benefit both the contractor and the owner. [ABSTRACT FROM AUTHOR]

Details

Language :
English
ISSN :
21698767
Database :
Complementary Index
Journal :
Proceedings of the International Conference on Industrial Engineering & Operations Management
Publication Type :
Conference
Accession number :
156792775