Cite
Deviation rectification of a high-rise building with piled raft foundation: a case study.
MLA
Xiao, Junhua, et al. “Deviation Rectification of a High-Rise Building with Piled Raft Foundation: A Case Study.” Proceedings of the Institution of Civil Engineers: Forensic Engineering, vol. 176, no. 1, Jan. 2023, pp. 22–32. EBSCOhost, https://doi.org/10.1680/jfoen.21.00036.
APA
Xiao, J., Guo, D., Wang, Q., Gao, X., & Sun, J. (2023). Deviation rectification of a high-rise building with piled raft foundation: a case study. Proceedings of the Institution of Civil Engineers: Forensic Engineering, 176(1), 22–32. https://doi.org/10.1680/jfoen.21.00036
Chicago
Xiao, Junhua, Daotong Guo, Qingpeng Wang, Xiang Gao, and Jianping Sun. 2023. “Deviation Rectification of a High-Rise Building with Piled Raft Foundation: A Case Study.” Proceedings of the Institution of Civil Engineers: Forensic Engineering 176 (1): 22–32. doi:10.1680/jfoen.21.00036.