Optimization of forest harvest scheduling at the operational level, considering precedence relationship among harvesting activities.
- Source :
- International Journal of Forest Engineering; Jan2023, Vol. 34 Issue 1, p1-12, 12p
- Publication Year :
- 2023
-
Abstract
- The competitiveness of forest companies is strongly affected by the costs associated with getting the raw material to the mills. As harvesting costs contribute significantly to this cost, mathematical programming models were developed to optimize the scheduling of harvest activities within and between cut blocks to reduce the overall cost. However, the precedence relationship between harvesting activities occurring concurrently across multiple cut blocks has not been considered in the existing literature. In this paper, a mixed-integer linear programming model is developed to optimize the scheduling of harvesting activities, considering the precedence relationship among harvesting activities. The objective of the model is to minimize the total costs. The model determines the start time and end time of each harvesting activity at each cut block, considering the movement time of machines between cut blocks. The model is applied to the case of a large forest company in British Columbia, Canada. The model's harvesting cost is only 1.37% higher than the lowest possible harvesting cost, and only 3 assigned machines have an idle time. The detailed harvesting schedule is generated based on the start time, the end time, and the operating time for each activity at each cut block. [ABSTRACT FROM AUTHOR]
Details
- Language :
- English
- ISSN :
- 14942119
- Volume :
- 34
- Issue :
- 1
- Database :
- Complementary Index
- Journal :
- International Journal of Forest Engineering
- Publication Type :
- Academic Journal
- Accession number :
- 161465667
- Full Text :
- https://doi.org/10.1080/14942119.2022.2085464