Back to Search
Start Over
Bi-objective speed-scaling robotic cell scheduling with peak power consumption constraint.
- Source :
- Journal of Industrial & Management Optimization; Oct2023, Vol. 19 Issue 10, p1-18, 18p
- Publication Year :
- 2023
-
Abstract
- This article studies the speed-scaling robotic cell scheduling problem with constrained peak power consumption. The objective is to minimize cycle time and peak power consumption simultaneously. First, we formulate a bi-objective mixed integer programming model for the problem and propose a strategy to preprocess overlapping time windows. Then, we analyze the structural properties of the proposed model and develop an iterative $ \varepsilon $-constraint method to generate its complete Pareto front. Numerical experiments demonstrate that the proposed method effectively solves the robotic cell scheduling problem and that appropriate scheduling of speed-scaling machines can make a trade-off between productivity and power consumption. [ABSTRACT FROM AUTHOR]
- Subjects :
- ROBOTICS
INTEGER programming
SCHEDULING
Subjects
Details
- Language :
- English
- ISSN :
- 15475816
- Volume :
- 19
- Issue :
- 10
- Database :
- Complementary Index
- Journal :
- Journal of Industrial & Management Optimization
- Publication Type :
- Academic Journal
- Accession number :
- 163744365
- Full Text :
- https://doi.org/10.3934/jimo.2023007