Back to Search Start Over

Bi-objective speed-scaling robotic cell scheduling with peak power consumption constraint.

Authors :
Che, Ada
Zhang, Sihan
Zhang, Yipei
Feng, Jianguang
Source :
Journal of Industrial & Management Optimization; Oct2023, Vol. 19 Issue 10, p1-18, 18p
Publication Year :
2023

Abstract

This article studies the speed-scaling robotic cell scheduling problem with constrained peak power consumption. The objective is to minimize cycle time and peak power consumption simultaneously. First, we formulate a bi-objective mixed integer programming model for the problem and propose a strategy to preprocess overlapping time windows. Then, we analyze the structural properties of the proposed model and develop an iterative $ \varepsilon $-constraint method to generate its complete Pareto front. Numerical experiments demonstrate that the proposed method effectively solves the robotic cell scheduling problem and that appropriate scheduling of speed-scaling machines can make a trade-off between productivity and power consumption. [ABSTRACT FROM AUTHOR]

Details

Language :
English
ISSN :
15475816
Volume :
19
Issue :
10
Database :
Complementary Index
Journal :
Journal of Industrial & Management Optimization
Publication Type :
Academic Journal
Accession number :
163744365
Full Text :
https://doi.org/10.3934/jimo.2023007