Back to Search Start Over

既有矿洞改扩建成地下实验室设计方案可行性研究.

Authors :
孙国文
宋超业
李国清
付功云
尹 芳
武宇翔
Source :
Tunnel Construction / Suidao Jianshe (Zhong-Yingwen Ban); 2023 Supplement, Vol. 43, p373-381, 9p
Publication Year :
2023

Abstract

<i>Copyright of Tunnel Construction / Suidao Jianshe (Zhong-Yingwen Ban) is the property of Tunnel Construction Editorial Office and its content may not be copied or emailed to multiple sites or posted to a listserv without the copyright holder's express written permission. However, users may print, download, or email articles for individual use. This abstract may be abridged. No warranty is given about the accuracy of the copy. Users should refer to the original published version of the material for the full abstract.</i> (Copyright applies to all Abstracts.)

Details

Language :
Chinese
ISSN :
20964498
Volume :
43
Database :
Complementary Index
Journal :
Tunnel Construction / Suidao Jianshe (Zhong-Yingwen Ban)
Publication Type :
Academic Journal
Accession number :
171382080
Full Text :
https://doi.org/10.3973/j.issn.2096-4498.2023.S1.043