Back to Search Start Over

An Analysis of the Ampacity and Capital Costs for Underground High Voltage Power Cable Construction Methods.

Authors :
Ratchapan, Ritthichai
Kriprab, Somchai
Marsong, Supapradit
Plangklang, Boonyang
Kongjeen, Yuttana
Source :
Przegląd Elektrotechniczny; 2024, Vol. 2024 Issue 1, p16-23, 8p
Publication Year :
2024

Abstract

<i>Copyright of Przegląd Elektrotechniczny is the property of Przeglad Elektrotechniczny and its content may not be copied or emailed to multiple sites or posted to a listserv without the copyright holder's express written permission. However, users may print, download, or email articles for individual use. This abstract may be abridged. No warranty is given about the accuracy of the copy. Users should refer to the original published version of the material for the full abstract.</i> (Copyright applies to all Abstracts.)

Subjects

Subjects :
CAPITAL costs
COST analysis
CABLES

Details

Language :
English
ISSN :
00332097
Volume :
2024
Issue :
1
Database :
Complementary Index
Journal :
Przegląd Elektrotechniczny
Publication Type :
Academic Journal
Accession number :
175060329
Full Text :
https://doi.org/10.15199/48.2024.01.03