Back to Search
Start Over
An Analysis of the Ampacity and Capital Costs for Underground High Voltage Power Cable Construction Methods.
- Source :
- Przegląd Elektrotechniczny; 2024, Vol. 2024 Issue 1, p16-23, 8p
- Publication Year :
- 2024
-
Abstract
- <i>Copyright of Przegląd Elektrotechniczny is the property of Przeglad Elektrotechniczny and its content may not be copied or emailed to multiple sites or posted to a listserv without the copyright holder's express written permission. However, users may print, download, or email articles for individual use. This abstract may be abridged. No warranty is given about the accuracy of the copy. Users should refer to the original published version of the material for the full abstract.</i> (Copyright applies to all Abstracts.)
- Subjects :
- CAPITAL costs
COST analysis
CABLES
Subjects
Details
- Language :
- English
- ISSN :
- 00332097
- Volume :
- 2024
- Issue :
- 1
- Database :
- Complementary Index
- Journal :
- Przegląd Elektrotechniczny
- Publication Type :
- Academic Journal
- Accession number :
- 175060329
- Full Text :
- https://doi.org/10.15199/48.2024.01.03