Short-term optimization scheduling method of cascade hydropower and photovoltaic complementary system based on pumping station operation strategy.

Authors :
Liu Hanxuan
Shi Linjun
Fu Hao
Wu Feng
Jicheng Fang
Yongli Ji
Source :
Frontiers in Energy Research; 2024, p01-11, 11p
Publication Year :
2024

Abstract

With the rapid development of photovoltaic power generation, how to improve the photovoltaic grid connection rate is an urgent problem to be solved. This article proposes an optimized scheduling method for the water and photovoltaic complementary system, taking into account the operation strategy of pump stations to improve the photovoltaic grid connection rate. Firstly, a multiobjective optimization scheduling model is constructed to consider both power generation and output fluctuation, and the uncertainty of photovoltaic power generation is analyzed from multiple perspectives. Then, taking the cascade hydropower stations and surrounding photovoltaic power stations in a river basin in Sichuan as an example, the operation strategy of pump stations is introduced into the water and photovoltaic complementary system, considering different weather scenarios, to reduce the photovoltaic curtailment rate. The study verifies that the introduction of pump stations can effectively increase the photovoltaic grid connection rate, and quantitatively analyzes the pump station capacity configuration under different photovoltaic penetration rates. [ABSTRACT FROM AUTHOR]

Details

Language :
English
ISSN :
2296598X
Database :
Complementary Index
Journal :
Frontiers in Energy Research
Publication Type :
Academic Journal
Accession number :
176025541
Full Text :
https://doi.org/10.3389/fenrg.2024.1367135