Back to Search Start Over

Integrated scheduling of production and distribution with two competing agents.

Authors :
Cheng, Bayi
Gao, Junwei
Zhou, Mi
Chu, Wei
Source :
Journal of the Operational Research Society; Sep2024, Vol. 75 Issue 9, p1826-1836, 11p
Publication Year :
2024

Abstract

This paper studies a two-agent scheduling problem on a single batch machine. Each job j has a processing time p<subscript>j</subscript> and a size s<subscript>j</subscript>. Jobs should be delivered to the agent as soon as possible. The objective is to minimize the service span of the first agent subject to an upper bound on the makespan of the other agent. We propose two approximation algorithms when jobs have identical processing times and in the general case. Then we conduct theoretical analyses to provide the provable guarantees on the performances of the algorithms. Finally, we conduct simulation analyses based on randomly generated instances to evaluate the average performances of the algorithm in the general case. [ABSTRACT FROM AUTHOR]

Details

Language :
English
ISSN :
01605682
Volume :
75
Issue :
9
Database :
Complementary Index
Journal :
Journal of the Operational Research Society
Publication Type :
Academic Journal
Accession number :
179170539
Full Text :
https://doi.org/10.1080/01605682.2023.2277867