Back to Search
Start Over
Navy Columbia (SSBN-826) Class Ballistic Missile Submarine Program: Background and Issues for Congress.
- Source :
- Congressional Research Service: Report; 8/5/2024, Preceding p1-59, 63p
- Publication Year :
- 2024
-
Abstract
- The Navy’s Columbia (SSBN-826) class ballistic missile submarine (SSBN) program is a program to design and build a class of 12 new SSBNs to replace the Navy’s current force of 14 aging Ohio-class SSBNs. Since 2013, the Navy has consistently identified the Columbia-class program as the Navy’s top priority program. The Navy procured the first Columbia-class boat in FY2021; the boat was funded with three-year incremental funding in FY2021-FY2023. The Navy procured the second Columbia-class boat in FY2024; the boat is being funded with two-year incremental funding (also called split funding) in FY2024-FY2025. The Navy wants to procure the remaining 10 boats in the program—boats 3 through 12—at a rate of one per year in FY2026- FY2035. The Navy’s FY2025 budget submission estimates the total procurement cost of the first boat at $15,179.1 million (i.e., about $15.2 billion) and the procurement cost of the second Columbia-class boat at $9,283.1 million (i.e., about $9.3 billion). The first boat’s procurement cost is much higher than that of subsequent boats in the class because the first boat includes most of the detail design/nonrecurring engineering (DD/NRE) costs for the class. (It is a long-standing Navy budgetary practice to incorporate the DD/NRE costs for a new class of ship into the total procurement cost of the first ship in the class.) The first boat’s estimated procurement cost includes $6,557.6 million for plans, meaning (essentially) the DD/NRE costs for the class. Excluding costs for plans, the estimated hands-on construction cost of the first ship is $8,621.5 million (i.e., about $8.6 billion). The Navy’s proposed FY2025 budget requests $3,341.2 million (i.e., about $3.3 billion) in procurement funding to complete the procurement cost of the second Columbia-class boat and $6,215.9 million (i.e., about $6.2 billion) in advance procurement (AP) funding for Columbia class boats to be procured in FY2026 and subsequent years. Issues for Congress for the Columbia-class program include the following: • The impact of an estimated 12- to 16-month delay in the delivery of the first Columbia-class boat on the Navy’s plans for replacing Ohio-class SSBNs on a timely basis; • industrial-base challenges of building both Columbia-class boats and Virginia-class attack submarines (SSNs) at the same time; • the risk of cost growth in the Columbia-class program; and • the potential impact of the Columbia-class program on funding that will be available for other Navy programs, including other shipbuilding programs. [ABSTRACT FROM AUTHOR]
- Subjects :
- SUBMARINES (Ships)
BALLISTIC missile defenses
DEFENSE procurement
MILITARY budgets
Subjects
Details
- Language :
- English
- ISSN :
- 07317069
- Database :
- Complementary Index
- Journal :
- Congressional Research Service: Report
- Publication Type :
- Report
- Accession number :
- 179717125